Eco Installations.

  • Installation in Adelaide: 45°C outside, 30°C indoors.

    Installation in Adelaide: 45°C outside, 30°C indoors.

  • Harmony Dawn, Petersorough, Canada.

    Harmony Dawn, Petersorough, Canada.

  • Harmony Dawn completed.

    Harmony Dawn completed.

  • Harmony Dawn interior.

    Harmony Dawn interior.

  • Natural House Project, Mono Mills, Canada.

    Natural House Project, Mono Mills, Canada.

  • Straw Bale House, Clarkson, Canada. High Energy Saving.

    Straw Bale House, Clarkson, Canada. High Energy Saving.

  • Chalk House Series 325, windows triple glazed, green construction design.

    Chalk House Series 325, windows triple glazed, green construction design.

  • Decalthlon project USA high-performance windows recognized for superior performance in the 2005 solar-powered home competition primarily sponsored by the U.S.Department of Energy (DOE).

    Decalthlon project USA high-performance windows recognized for superior performance in the 2005 solar-powered home competition primarily sponsored by the U.S.Department of Energy (DOE).

Houses Under Construction.

There are many designs in which Sovereign windows have been incorporated, including straw bale, monolith concrete, double brick, brick veneer, insulated foam and sandwich foam.

  • 325 awning and fixed coupled together.

    Awning and fixed coupled together.

  • 325 awning and two 325 fixed.

    325 awning and two 325 fixed.

  • 325 Awning Eco Home.

    325 Awning Eco Home.

  • 325 fixed low profile during installation.

    325 fixed low profile during installation.

  • 8 star house stage i.

    8 star house stage 1.

  • 8 star house stage 2.

    Sovereign awning and fixed nearing completion in an eco-block wall system.

  • 900 double hung.

    900 double hung.

  • Double hung window during installation.

    Double hung window during installation.

  • Double slider door during installation.

    Double slider door during installation.

  • Palm Beach Level 3, 6m segmented window.

    Palm Beach Level 3, 6m segmented window.

  • Palm Beach Levels 1,2 – 4m segmented window.

    Palm Beach Levels 1,2 – 4m segmented window.

  • Single sliding door installed.

    Single sliding door installed.

Renovations.

All windows require replacement at some point in time, providing the opportunity to upgrade not only the performance of the window but the look and functionality.

With the new mandatory requirements for commercial buildings and homes coming into force in 2010, selling your home on a competitive basis will only be easier with superior performing windows.

  • Casement before.

    Casement before.

  • Casement with venetian after double glazed.

    Casement with venetian after. Double glazed.

  • Old double hung with colonial bars.

    Old double hung with colonial bars.

  • New double glazed with colonial bars next to a fixed lite and flyscreen.

    New double glazed with colonial bars next to a fixed lite and flyscreen.

  • Double hung with fixed and colonial bars.

    Double hung with fixed and colonial bars.

  • Unit renovation.

    Unit renovation.

  • Old aluminium sliding window track.

    Old aluminium sliding window track.

  • New double slider track after one year.

    New double slider track after one year.

  • New double slider replacement.

    New double slider replacement.

  • Sliding door installed.

    Sliding door installed.

  • Single French door during installation.

    Single French door during installation.

  • Single French door with double hung.

    Single French door with double hung.